Project Summary:
The Zhoushan port electrical power plant construction scale is about 4.4 million KW.The 1st construction phase is to construct 4×600,000 K/Wt function group, initially keeping 2×1,000,000 K/wt function group as long. The land is covering 4,000 to 5,000 arches, and building 2 of 3.5 to 5 tons ports. This project benefits the Zhejiang province eclectic consumption, which supplies 500,000 V double-route through the cities as Liuheng Lands, Dingzimen, Meishan Lands, and then the electric network of Zhejiang province. The length of the electric is 26,089 meters in all, which including 3,717 meters and 1,552 meters astride. The approach total investment is up to $11 billion, and the 1st phase of the entire project will be finished in 2010. |