GTIF NEWS
The 11th China International Fair for Investment & Trade will be held on September 8, 2007 in Xiamen, China. Aiming at “Attracting FDI” and “Going Global”, the CIFIT will be featured by the follow...
  • China Preparing National Investment Company of Foreign Exchange Establishment Brazil Waiting for Opportunity
  • Matchmaking Symposium for Transportation & Freight to Held during 11th CIFIT
  • China’s overseas investment climbs to the 13th place globally
  • Professionals believe China’s logistics industry has become a foreign investment
  • Key Investment Attracting Project of Xiamen Matchmaking Symposium Held
  • Give us a break from the `China-threat'
  • We invite you to invest to Poland!
  •  
    HOME PROJECTS EXHIBITION CONFERENCE FAIR INFO 中文
    PROJECT LIST
    MATCHMAKING MEETING
    MATCHMAKING FORUM SCHEDULE
    Email address:

    Password:

    Forget password?
    New? Register for investor or project
    Project Description
    Project Title: Project of Qiandao Port
    Organizer/Firm: GFO
    Country: China
    Business Field: Port
    Ownership: Joint Venture
    Organizer Business Introduction:

    2006 Annual Net Sales(USD):
    2005 Annual Net Sales(USD):
    Project Interest: Partner Search/Financial Needs
    Project Location: China
    Financial Specifications:
    Loan Needs(USD):
    Project Summary:

    a.Brief Projector background:
    The stable fund Fishing Industry of Qiandao in Wendeng City has fixed assets in $190 million; it has 670 employees, including about 40 technical specialists. Also, there are subsidiaries in Shipper manufactory, refrozen companies, herbs and feeding animals’ workhouses, and one port. The capacity is up to 30 shipping tankers at one time; feeding sea cucumber, sea-ear, and certain treasure fishes more than 100 thousand grain; annual producing marten 100 thousand; the volume of refreezing industry up to 5,000 tons. In 2004, the total sales is $339 million RMB, and the net profit is $56.34 million RMB.

    b.Project Content:
    The covered area is up to 375 thousand sq meters; the depth of coastline is 6 to 8 meters; coastline is 900 meters in length. So far, the dam is 600 meters; one 1,000 tons sideway; two 50 tons cranes; one 500 tons sideway; 13 thousand sq meters port parking area; and 300 equipments variously. The total investment is up to $400 million RMB.

    c.Evaluation and Analysis: The domestic’s shipper manufacturing industry has been pushed into pea season, the orders have been assigned after 2008.As the local port is not finished, and there are no places to park ships for fixing. After the project is done, the annual parking volume will be reached to 2 million tons, and the manufacturing capability will be improved to reach 100,000 tones.

    The investment return time is about six to eight years

    Mode of Cooperation: co-op.

    Risk and Profit Analysis:
    This project has been hit : [ 1200 ].
    If you are interested in gaining more details on the project, please do E-planning and register your firm information. We will be glad to assist you.

    E_PLANNING NOW

      HOME ABOUT GTIF PROJECTS EXHIBITION CONFERENCE FAIR INFO SPONSORS CONTACT LOGIN